Sign In | Join Free | My himfr.com
Home > Anodizing Production Line >

1500Ton / M Oxidation Production Line With Advanced Waste Management

Guangdong MEI-AL Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 1500Ton / M Oxidation Production Line With Advanced Waste Management from wholesalers
     
    Buy cheap 1500Ton / M Oxidation Production Line With Advanced Waste Management from wholesalers
    • Buy cheap 1500Ton / M Oxidation Production Line With Advanced Waste Management from wholesalers

    1500Ton / M Oxidation Production Line With Advanced Waste Management

    Ask Lasest Price
    Brand Name : MEI-AL
    Model Number : APL-1500T
    Price : RMB12,000,000-16,000,000/set
    Payment Terms : T/T
    Supply Ability : 1500T/month
    Delivery Time : 180-200days
    • Product Details
    • Company Profile

    1500Ton / M Oxidation Production Line With Advanced Waste Management

    1500Ton / M Oxidation Production Line with Advanced waste management


    一.Description

    1.Anodizing production lines typically consist of a series of precise steps, from pretreatment to oxidation, and then to post-treatment, each of which is crucial.

    2.The intelligence and automation of the anodizing production line are signs of its modernization. By introducing IoT technology, production lines can monitor and adjust process parameters in real-time, ensuring consistency and reducing waste. Automated equipment improves production efficiency and reduces errors caused by manual intervention.

    3.In addition, environmental protection is another major concern of modern anodizing production lines. The use of fluorine free chemicals and bio based cleaning agents, as well as the implementation of water circulation systems and heat recovery, are all aimed at reducing environmental impact and achieving sustainable production.

    二. Design Condition

    1AlloyAluminium 6061 to 6063 or others
    2Anodizing film thinkness10~ 12µm micron
    3Average coverage area350m²/T (ton)
    4Max aluminium profile length6500mm
    5Extrusion ratio2.5kg/m²
    6Working hour/m300d/m x 20h/d = 600h/m
    7Racking systemThree fixtures /rack
    8Racking operationManual
    9Equipment Usage Rate0.9
    10Power supplyAC 3phase 380v 50hz
    11Control PowerAC220V 50Hz
    12Water supply2kg/cm²·G
    13Hot steam6kg/cm²·G
    14Compressor air6kg/cm²·G

    三.Process Tank

    1. Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
    2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 2 Tanks
    3. NeutralizationFree sulfuric acid180±20g/l】 1 Tank
    4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 5 Tanks
    5. Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 3 Tanks
    6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 3 Tank

    四. Treatment Process:

    1. Degreasing
      (1) 6jig(rack)/ tank x 1 tank
      =6jig(rack)
      (2) treatment time: 2-5min
    2. Alkaline Etching
      (1) 6jig(rack) / tank x 2 tank
      =12jig(rack)
      (2) treatment time: 3-15min
    3. Neutralization
      (1) 6jig(rack) / tank x 1 tank
      =6jig(rack)
      (2) treatment time: 1-5min
    4. Anodizing
      (1) 3 jig(rack)/tank x 5tanks = 15jig(rack)
      (2) Current density: 130A/m²
      (3) Process time: 30min
      (4) Unprocess time: 10min
      (5) Total time 30+10=40min

    (6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

    1. Colour 1

    1) Clour process: Mix Salts

    2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

    3) Current density: 70A

    4) Process time: 2-8min


    6. Sealing
    1) Sealing menthod: Sealing at Medium or Normal Temperature
    2)
    Quantity: 6jig(rack)/tank x 1 tank
    3) Process time 10-15min


    五. Design Parameter and Setting

    1. Anodizing treatment area:
    1) Each anodizing process tank need 40min ,where total jig(rack)/year:

    ( 3 rack x 5 tank x 60min/h) ÷40min x600 hour =13500jig(rack)

    2) Design 50m²/jig(rack) . Where every tank is 100m²
    3)
    Area treatment/year : 13500jig(rack)x 50m² /jig =675000m²


    2. Anodizing treatment weight:
    Monthly output : 675000m²÷350m²/T*0.9=1735T≧1500T


    3. Power consumption:
    1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

    Power Rectifier : 15000A =3unit
    2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

    Colour Rectifier : 8000A =3 unit


    1500Ton / M Oxidation Production Line With Advanced Waste Management六. Process Chat


    Discription for Un
    1DeDegreasing
    2RsRinsing
    3HW RsHot Water Rinsing
    4AEAlkaline Etching
    5NeNeutralization
    6AnAnodizing
    7ClColoring
    8SlSealing
    9MUMaterial Unloading
    10PcPacking


    Quality 1500Ton / M Oxidation Production Line With Advanced Waste Management for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Guangdong MEI-AL Technology Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)