Sign In | Join Free | My himfr.com
Home > Anodizing Production Line >

2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment

Guangdong MEI-AL Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment from wholesalers
     
    Buy cheap 2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment from wholesalers
    • Buy cheap 2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment from wholesalers

    2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment

    Ask Lasest Price
    Brand Name : MEI-AL
    Model Number : APL-2000T
    Price : RMB20,000,000-30,000,000/set
    Payment Terms : T/T
    Supply Ability : 1set/6 months
    Delivery Time : 180-200days
    • Product Details
    • Company Profile

    2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment

    2000T/M Aluminum Anodizing Production Line for Metal Electroplating Surface Treatment

    一. Pruduction:

    1.An aluminum anodizing production line is a complex but highly efficient system that transforms raw aluminum into high-quality, durable products. 2.On this precision aluminum profile anodizing production line, the metal surface undergoes meticulous treatment, demonstrating excellent corrosion resistance and aesthetics.

    3.Whether in the fields of architecture, transportation, or electronics, the aluminum profiles created by anodizing production lines have won wide acclaim for their unique charm and excellent performance.

    二. Design Condition:

    1AlloyAluminium 6061 to 6063 or others
    2Anodizing film thinknessThe desired anodizing film thickness is 10-12µm (microns)
    3Average coverage areaThe average coverage area is 350m² per ton of aluminum profiles
    4Maximum aluminum profile length6500mm
    5Extrusion ratio2.5kg/m²
    6Working hour/m300d/m x 20h/d = 600h/m
    7Racking systemThree fixtures /rack
    8Racking operationManual
    9Equipment Usage Rate0.9
    10Power supplyAC 3phase 380v 50hz
    11Control PowerAC220V 50Hz
    12Water supply2kg/cm²·G
    13Hot steam6kg/cm²·G
    14Compressor air6kg/cm²·G

    四. Treatment Process:

    1. Degreasing
      (1) 6jig(rack)/ tank x 1 tank
      =6jig(rack)
      (2) treatment time: 2-5min
    2. Alkaline Etching
      (1) 6jig(rack) / tank x 2 tank
      =12jig(rack)
      (2) treatment time: 3-15min
    3. Neutralization
      (1) 6jig(rack) / tank x 1 tank
      =6jig(rack)
      (2) treatment time: 1-5min
    4. Anodizing
      (1) 3 jig(rack)/tank x 6tanks = 18jig(rack)
      (2) Current density: 130A/m²
      (3) Process time: 30min
      (4) Unprocess time: 10min
      (5) Total time 30+10=40min

    (6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

    1. Colour 1

    1) Clour process: Mix Salts

    2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

    3) Current density: 70A

    4) Process time: 2-8min


    6. Sealing
    1) Sealing menthod: Sealing at Medium or Normal Temperature
    2)
    Quantity: 6jig(rack)/tank x 1 tank
    3) Process time 10-15min

    五.Process Tank

    1. Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
    2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 2 Tanks
    3. NeutralizationFree sulfuric acid180±20g/l】 1 Tank
    4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 6 Tanks
    5. Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 3 Tanks
    6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 3 Tank

    六. Design Parameter and Setting

    1. Anodizing treatment area:
    1) Each anodizing process tank need 40min ,where total jig(rack)/year:

    ( 3 rack x 6 tank x 60min/h) ÷40min x600 hour =16200jig(rack)

    2) Design 50m²/jig(rack) . Where every tank is 100m²
    3)
    Area treatment/year : 16200jig(rack)x 50m² /jig =810000m²


    2. Anodizing treatment weight:
    Monthly output : 810000m²÷350m²/T*0.9=2082T≧2000T


    3. Power consumption:
    1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

    Power Rectifier : 15000A =6unit
    2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

    Colour Rectifier : 8000A =3 unit


    七. Process Chat

    Discription for Un
    1DeDegreasing
    2RsRinsing
    3HW RsHot Water Rinsing
    4AEAlkaline Etching
    5NeNeutralization
    6AnAnodizing
    7ClColoring
    8SlSealing
    9MUMaterial Unloading
    10PcPacking


    Quality 2000T/M Aluminum Anodizing Production Line For Metal Electroplating Surface Treatment for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Guangdong MEI-AL Technology Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)